S. No. | Project Details |
System Involved |
Location |
|||
---|---|---|---|---|---|---|
1 | Project: Aden Power Plant Phase-1 Project
at Yemen Client: Electricity & Energy Ministry Yemen Capacity: 120 MW Contractor: PESCO |
• Fire Pump Sets • Outdoor Fire Hydrant System • Fire Hose Cabinet • Automatic Wet Sprinkler • Automatic Water Spray System • Fire Extinguishers • Fire Alarm & Detection System |
YEMEN | |||
2 | Project: Dubal H-Class Combined Cycle
Power Plant Power Jebel Ali, UAE Client: DUBAL (Dubai Aluminium) Capacity: 700 MW Contractor: Siemens |
• Centralized CO2 System
with Fuel Gas valve skid • Fire & Gas detection & Alarm System |
UAE | |||
3 | Project: Layyah 900 MW CCPP Project –
Sharjah UAE Client: SEWA(Sharjah Electricity and Water Authority) Capacity: 900 MW Contractor: Elsewedy Electric, Egypt. |
• Fire Pump Sets • Fire Water Tanks • Indoor Hydrant System • Outdoor Hydrant System • Water Spray System • Sprinkler System • Foam Water Sprinkler System • Fire Extinguishers • FM200 Gas Extinguishing System • CO2 Gas Extinguishing System • Fire & Gas Detection and Alarm System |
UAE | |||
4 | Project: Jebel Ali Power Station “K”, Phase-III Client: DEWA Contractor: DF Energy, Spain |
• Outdoor Hydrant System • Indoor Hydrant System • Water Spray System • Sprinkler System • Low Expansion Foam / Foam Water Spray System • Fire Extinguishers • FM200 Gas Extinguishing System • Fire & Gas Detection and Alarm System |
UAE | |||
5 | Project: Aweer Power Station-H Phase-IV
GT area Client: DEWA Contractor: Siemens |
•Fire Pump Sets • Fire Water Tanks • Fire Monito System for Coal Storage Area • Outdoor Hydrant System • Indoor Hydrant System • Deluge Water Spray System • Sprinkler System • FM200 Gas Extinguishing System • Low Pressure C02 extinguishing system • Fire Detection and Alarm System • Fire Extinguishers |
UAE | |||
6 | Project: Aweer Power Station-H Phase-IV Client: DEWA Contractor: Elsewedy, Egypt. |
• Fire Pump Sets • Fire Water Tanks • Fire Monito System for Coal Storage Area • Outdoor Hydrant System • Indoor Hydrant System • Deluge Water Spray System • Sprinkler System • FM200 Gas Extinguishing System • Low Pressure C02 extinguishing system • Fire Detection and Alarm System • Fire Extinguishers |
UAE | |||
7 | Project: DFPI- Delayed Coker Unit Ph-2 Client: Naftan Refinery, Belarus Contractor: DF Energy, Spain |
Deluge Valve Cabinet with all Accessories | Belarus | |||
8 | Project: Fire Detection Sys. For DCU and Fire
Fighting System for VGRS,
Delayed Coker Unit Ph-2 Client: Naftan Refinery, Belarus Contractor: DF Energy, Spain |
• Fire Detection System • Deluge Cabinet Valve • Fire Extinguisher • Sprinkler System |
Belarus | |||
9 | Project: Hassyan 4x600 MW Clean Coal
Power Plant Project – Jetty Area Client: DEWA Contractor: CCCC Second Harbor Consultants Co, Ltd, China |
• Outdoor Hydrant System • Indoor Hydrant System • Water Spray System • Sprinkler System • Foam Water Spray System • Fire Extinguishing System • FM200 Gas Extinguishing System • Fire Detection and Alarm System |
UAE | |||
10 | Project: Hassyan 4x600 MW Clean Coal
Power Plant Project PH-1 Client: DEWA Contractor: Herbin Electric International Company Ltd |
• Fire Pump Sets • Fire Water Tanks • Fire Monito System for Coal Storage Area • Outdoor Hydrant System • Indoor Hydrant System • Deluge Water Spray System • Sprinkler System • FM200 Gas Extinguishing System • Low Pressure C02 extinguishing system • Fire Detection and Alarm System • Fire Extinguishers |
UAE | |||
11 | Project: Mega Reservoirs Project Package-
C (PRPS-5) Client: Kahramaa Contractor: Consolidated Contracting Co (CCC) |
• Fire Pump System. • Indoor Hydrant System • Sprinkler System • Foam Water Spray System • Foam Monitor System • Fire Extinguishing System • FM200 System. • Voice Evacuation System • Fire & GAS Detection & Alarm System |
Qatar | |||
12 | Project: Mega Reservoirs Project Package-
A (PRPS-1) Client: Kahramaa Contractor: Consolidated Contracting Group (CCC) |
• Fire Pump System. • Indoor Hydrant System • Sprinkler System • Foam Water Spray System • Foam Monitor System • Fire Extinguishing System • FM200 System. • Voice Evacuation System • Fire & GAS Detection & Alarm System |
Qatar | |||
13 | Project: Doha SWRO Desalination Plant
Phase-I at Kuwait Client: Ministry of Electricity & Water, Kuwait Contractor: Doosan, Korea |
• Fire Pump System. • Fire Hydrant System. • Deluge Water Spray System. • Indoor Hydrant System • Foam Spray System • Sprinkler System • Inergen Gas Extinguishing System • Fire Extinguisher • Fire & GAS Detection & Alarm System |
Kuwait | |||
14 | Project: Phase-12 Qatar Substations Client: Kahramaa Contractor: Siemens |
• Deluge Water Spray System • Fire Water Tank • Fire Pump System • Fire Hydrant System • Fire Sealant • Sprinkler System • Fire Detection & Alarm System • FM200 System |
Qatar | |||
15 | Project: 3 Nos of DEWA Substations
(Majan, MaAden, Nad Al
Hammar) Client: DEWA Contractor: ABB |
• Fire Water Pump • Fire Water Tank • Indoor & Outdoor Hydrant • Water Mist System • Fire Extinguishers • Breathing apparatus • Inert Gas System • Fire Detection & Alarm System |
UAE | |||
16 | Project: Jebel Ali Power Station MExtension
Project, (BOP) Dubai,
UAE Client: M/s DEWA Contractor: Siemens, Germany Capacity: 700 MW |
• Indoor Hydrant System • Sprinkler System • Deluge Water Spray System • Foam Water Spray System • Fire Extinguisher system • Fire & GAS Detection and Alarm System • FM200 System |
UAE | |||
17 | Project: Jebel Ali Power Station MExtension
Project (GT)Dubai,
UAE Client: M/s DEWA Contractor: Siemens, Germany |
• Argonite Extinguishing
System • Co2 Extinguishing System • Fire & GAS Detection System |
UAE | |||
18 | Project: UMM Al Houl Power Project,
Qatar (Power & GIS Package) Client: UMM Al Houl Power IWPP (Power) Kahramaa (GIS) Contractor: Samsung C&T Korea |
• Fire Pump Set (Power) • Fire Pump Set (GIS) • Fire Water Tank (GIS) • Outdoor Hydrant System • Indoor Hydrant System • Deluge Water Spray System • Sprinkler System • FM200 System • Fire Extinguisher • Fire & GAS Detection & Alarm System |
Qatar | |||
19 | Project: UMM Al Houl Power Project,
Qatar (Desalination & RO
Package) Client: UMM Al Houl Power IWPP Contractor: Hitachi, Japan |
• Outdoor Hydrant System • Indoor Hydrant System • Deluge Water Spray System • Sprinkler System • FM200 System • Fire Extinguisher • Fire & GAS Detection & Alarm System |
Qatar | |||
20 | Project: Khazna Data Center, Meydan,
Dubai and Masdar City, Abudhabi Client: MUBADALA Contractor: M+W/ Commodore JV |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppression System for entire Data Centre including pre-action system for White Space, Deluge system for Generator Rooms & Wet System for Office Areas. Total 31 Zone Control Valves | UAE | |||
21 | Project: Ferrari World Abu Dhabi Phase -2 Client: Farah Leisure Theme Park LLC Contractor: Sixco / Voltas |
• FM 200 System • Sprinkler System • Fire Hose Reels • Fire Extinguishing System • Fire Deluge System |
UAE | |||
22 | Project: Al Udeid Air Base Qatar Helicopter
Hanger Building Client: Qatar Armed Force Contractor: Mapco INC WLL, Qatar |
• Alarm Valves Assembly • Automatic Air Release valve • Atmospheric Foam Tank • Fire Hose Reel Rack & Cabinet – Foam • Foam Pump and Controllers • 3% AFFF Foam Concentrate |
UAE | |||
23 | Project: Yanbu Power and Desalination
Plant (Boiler Package) Client: SWCC Contractor: Alstom, USA |
• Indoor Hydrant System • Water Spray System • Fire Extinguisher |
Saudi Arabia | |||
24 | Project: 132/33 kV HALUL Substation Client: Qatar Petroleum Contractor: L&T |
• Deluge Water Spray System • Fire and Gas Detection System • Fire Hydrant System • Novec 1230 System • Fire Extinguishers |
Qatar | |||
25 | Project: Yanbu-III Power & Desalination
Package-P and Package-T Project –
KSA Client: SWCC Contractor: Samsung Engineering Co. Ltd, Korea Capacity: 2708.5 MW |
• Fire Pump Sets • Indoor Hydrant System • Outdoor Hydrant System • Foam Pump Station • Jetty Area Booster Fire Pumps. • Jetty Area Foam Monitor • Water Spray System • Cooling water Spray System • Sprinkler System • Foam Injection System • Foam Sprinkler System • Foam Water Spray System • Co2 Gas Extinguishing System • Clean Agent Gas Extinguisher System • Fire Extinguishers • Fire & Gas Detection System • Fire Alarm System |
Saudi Arabia | |||
26 | Project: Yanbu Power and Desalination
Plant Package “D”-KSA. Client: SWCC Contractor: Doosan Heavy Industries & Construction co., Ltd. Korea Capacity: 550,000 m3/d-Water Production |
• Fire Pump Sets • Indoor Hydrant System • Outdoor Hydrant System • Automatic Water Spray System • Manual Water Spray System. • Co2 Gas Extinguishing System • Foam Water Extinguishing System • Portable Extinguishing System • Mobile Extinguishing System • Fire & Gas Detection System • Fire Alarm System |
Saudi Arabia | |||
27 | Project: Automatic Dry Power System
Projecting of 7 nos of LPG/LNG
tanks of 54 mts / 45 mts dia. Client: ADGAS – Das Island Plant # 27 |
• Fire Suppression Dry
Chemical System • Detection System • Dry Powder Skid |
UAE | |||
28 | Project: HFO Diesel Power Plants, Iraq
(200 MW North Diwaniyah Diesel
Power Plant, 200 MW Missan
Diesel Power Plant, 200 MW
Karbala Diesel Power plant, 200
MW East Diwaniyah Diesel Power
plant) Client: Ministry of Electricity, Iraq Contractor: STX Heavy Industries |
• Fire Water system • Fire Foam System • Fire Pump • Fire Alarm |
Iraq | |||
29 | Project: Ras Al Khair Power Plant Phase I Client: SWCC Our Ref: P900220 Contractor: SEPCO III Capacity: 12x200 – 2,400 MW Net Power output (1.050 MW Supply to SEC + 1,350 MW Supply to Ma’aden Aluminum Complex) 1,025 Tm³/d water production (1,000 Tm³/d supply to SWCC + 25 Tm³/d supply to Ma’aden Aluminum Complex) |
• Co2 Extinguishing System • Standpipe and Hose system (Indoor Hydrants) • Fire Fighting Pumps • Fire & Gas Detection Alarm System • Ring Mains/ Outdoor Hydrant System. • Standpipe and Hose system Automatic Sprinkler System • Automatic deluge water spray system for transformers • Foam and Water Spray For Fuel Oil Tanks |
Saudi Arabia | |||
30 | Project : Dry Chemical System (CLP) for
KJO AL-Khafji crude related
offshore projects (KCROP) Client : Al Khafji Crude Related Offshore Operations Consultant : TECHNIP |
Dry Chemical System Skid
(CLP) Scope – Supply & Commissioning |
Saudi Arabia | |||
31 | Project : Fire Fighting System (CLP) for
KJO AL-Khafji crude related
offshore projects (KCROP) Client : Al Khafji Crude Related Offshore Operations Contractor : TECHNIP |
• Fire Fighting System –
Foam Water Deluge Skid • (CLP) • Scope - Supply & Commissioning |
Saudi Arabia | |||
32 | Project: STU & AGRO Packages Qatar
Petroleum Client: Petrofac |
• Deluge skid – 5 Nos • Scope – Supply and Commissioning |
Qatar | |||
33 | Project : 2 x 150 MW Coal Based Thermal
Power Plant, Ph-2, Chillakur Mandal,
Nellore District, Andhra Pradesh Client : M/s. Madhucon Projects Limited, Hyderabad, India Consultant : M/s. MN Dastur & Co., Pvt Ltd, Chennai |
• Hydrant System • High Velocity Water Spray System • Medium Velocity Water Spray System • Sprinkler System • Fire Alarm System • Fire Extinguishers |
India | |||
34 | Project: Chabahar Gas Turbine Power Plant Client: Iran Power Development Company Main Contractor: Mapna International |
• Fire Pumps • Foam system • Fire Hydrants & water spray system • Fire Detection & Alarm System • Scope –Supply, technical services, supply & Commissioning |
Iran | |||
35 | Project : Jebel Ali “M” Station Client : Dubai Electricity & Water Authority (DEWA) Contractor : Doosan Consultant : Fichtner Engineering Consultants |
• Water System • Gaseous System • Foam System • Fire Alarm & Detection System • Gas Detection System • Fire Extinguisher System • CO2 System • FM 200 System • Water Spray & Hydrant System • Scope – Design, Supply, Installation & Commissioning. |
Dubai | |||
36 | Project : Jebel Ali “M” Station Client : Dubai Electricity & Water Authority (DEWA) Contractor : Fisia Italimpianti Consultant : Fichtner Engineering Consultants |
• Water System • Gaseous System • Foam System • Fire Alarm & Detection System • Gas Detection System • Fire Extinguisher System • CO2 System • Water Spray & Hydrant |
Dubai | |||
37 | Project : Ras Abu Fontas RAF – A1 Client : Qatar Electricity & Water Authority (QEWA) Contractor : Fisia Italimpianti Consultant : Parsons Brinckerhoff International Inc. |
• Fire Pumps • Hydrant System • Indoor Hydrant System • Fire Alarm & Detection System • Deluge Spray System • Sprinkler System • Fire Extinguisher System • FM 200 System • Scope – Design, Supply, Installation & Commissioning. |
Qatar | |||
38 | Project : Aweer Gas Turbine Power
Station “H” Phase-III Client : Dubai Electricity & Water Authority (DEWA) Contractor : Emirates Trading Agency (PPD) Consultant : Mott MacDonald |
• Fire alarm system • Foam system • Spray system • CO2 System • Hydrant system • Indoor hose reel system |
Dubai | |||
39 | Project : Shuaibah IWPP Client : SMAWEC Contractor : Doosan Heavy Industries & Construction Co. |
• Fire Fighting System • Fire Alarm System |
Saudi Arabia | |||
40 | Project : Water Mist System for Service
Tunnel ST1 & ST2 Client : Dubai Properties Contractor : Zener Electrical Contracting Co. |
• Water Mist System • Scope – Supply, Installation, Testing & Commissioning |
Dubai | |||
41 | Project : Ras Abu Fontas B2 Expansion
Project Client : Qatar Electricity and Water Authority Contractor : GE International Inc, USA Consultant : Mott MacDonald |
• Hydrant System • Indoor Hose Reel System • Deluge System • Wet Sprinkler System • CO2 System • Scope – Supply, Installation, Testing & Commissioning |
Qatar | |||
42 | Project : District Cooling Project at Khalif
City, Abu Dhabi. Client : Nael Energy & General Enterprises Est. Consultant : Archon |
• FM-200 Fire Suppression
System • Sprinkler System • Hydrant / Hosereel System • Fire Alarm System • Fire Extinguisher System |
Al Ain UAE |
|||
43 | Project: El Kureimat Power Station Client: Power Generation Engg & Services Co. Contractor: Siemens AG Power Generation, Germany |
• Foam system • Water spray system • Hydrant system • Fire pumps • Hose Reel System |
Egypt | |||
44 | Project: Jebel Ali Power & Desalination “L
Phase II Client: Dubai Electricity &Water Authority Contractor: Hyundai Engg & Construction Co. Consultant: Lahmeyer International |
• Fire Fighting system • CO2 System • Hydrant system • Indoor hose reel system • Fire & Gas Detection System |
Dubai | |||
45 | Project: Jebel L2 Gas Turbine Protection
4x200MW Client: Dubai Electricity & Water Authority Contractor: Siemens AG, Germany Consultant: Lahmeyer International |
• Fire alarm system • Fire Detection system |
Dubai | |||
46 | Project: Al Aweer Gas Turbine Power Station
3x250MW "H” Phase II, U.A.E. Client : Dubai Electricity & Water Authority Contractor: Siemens AG Power Generation, Germany Consultant: Mott MacDonald |
• Fire alarm system • Foam system • Spray system • CO2 System |
Dubai | |||
47 | Project: Jumeirah Lake Towers Parking Garages Client : DMCC Contractor: Trinity Engg. Services Consultant: Wilber Smith Project Management: Faithful & Gold |
• Fire pumps • Hose reel system • Fire fighting system • Sprinkler system • Fire detection system |
Dubai | |||
48 | Project: New Talkha Power Station 750MW CCP Client : Power Generation Engg & Services Co. Contractor: Siemens AG Power Generation, Germany |
• Foam system • Water spray system • Hydrant system • Fire pumps • Hose Reel System • Fire alarm system • Scope – Turnkey |
Egypt | |||
49 | Project: Jebel Ali Power & Desal Station “L” Ph-I Client : Dubai Electricity & Water Authority Consultant: Lahmeyer International Contractor : Toshiba Corporation |
• Water System • Gaseous System • Foam System • Fire Alarm & Detection System • Gas Detection System • Fire Extinguisher System • CO2 System • Water Spray & Hydrant System |
Dubai | |||
50 | Project: Umm Al Nar Independent Power &
Water Project Client : Arabian Power Company Consultant: Mott MacDonald Contractor: Toshiba Corporation |
• Water System • Gaseous System • Foam System • Fire Alarm & Detection System • Fire Extinguisher System • CO2 System • Water Spray & Hydrant System • Scope – Design, Supply, Installation & Commissioning. |
Abu
Dhabi UAE |
|||
51 | Project: Ras Laffan Combined Cycle Power
Plant Client: Enel Power, Italy Consultant: In House |
• Fire Detection & Alarm Systems • Fire Hydrant Systems • Water Spray Transformers • Fire Pumps & Pump House • Carbon Di Oxide Systems • Fire Extinguishers • Sprinkler System |
Qatar | |||
52 | Project: DEWA Wahadlnd 132Kv Dewa
Substation Client: DEWA Contractor: KEC Group |
• Fire Pump Sets • Outdoor Hydrant System • Indoor Hydrant System • Deluge Water Spray System • Sprinkler System • Nitrogen Gas Extinguishing System • Fire Detection and Alarm System • Aspiration Smoke Detection system • Fire Extinguishers |
UAE | |||
53 | Project: DEWA LIWAN 132/11 kV Substation Client: DEWA Contractor: MAETEL, Spain |
• Fire Pump Sets • Outdoor Hydrant System • Indoor Hydrant System • Deluge Water Spray System • Sprinkler System • F200 Gas Extinguishing System • Fire Detection and Alarm System • Fire Extinguishers |
UAE | |||
54 | Project: 132-11kV Dewa Substations
(Hassa Street, Marasi, Twrkaifaf,
Umramool) Client: DEWA Contractor: Al Fanar |
• Fire Water Pump • Fire Water storage tank • Indoor & Outdoor Hydrant System • Deluge Mist System • Fire Extinguishers & Breathing Apparatus. • Inert Gas based system- IG100 • Fire Detection & Alarm System |
UAE | |||