Reference List
1. Aden Power Plant Phase-1 Project at Yemen
Project Details | System Involved | Location |
---|---|---|
Client: Electricity & Energy Ministry Yemen Capacity: 120 MW Contractor: PESCO |
|
YEMEN |
2. H-Class Combined Cycle Power Plant Power Jebel Ali, UAE
Project Details | System Involved | Location |
---|---|---|
Client: DUBAL (Dubai Aluminium) Capacity: 700 MW Contractor: Siemens |
|
UAE |
3. Layyah 900 MW CCPP Project – Sharjah UAE
Project Details | System Involved | Location |
---|---|---|
Client: SEWA(Sharjah Electricity and Water Authority) Capacity: 900 MW Contractor: Elsewedy Electric, Egypt. |
|
UAE |
4. Jebel Ali Power Station “K”, Phase-III
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: DF Energy, Spain |
|
UAE |
5. Aweer Power Station-H Phase-IV GT area
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Siemens |
|
UAE |
6. Aweer Power Station-H Phase-IV
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Elsewedy, Egypt. |
|
UAE |
7. 400-132kV Shams Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: ABB |
|
UAE |
8. QAFAC for FM200 system
Project Details | System Involved | Location |
---|---|---|
Client: QAFAC, Qatar Contractor: QAFAC |
|
QATAR |
9. Vijana Tower Phase-II Fire suppression & detection system
Project Details | System Involved | Location |
---|---|---|
Client: ESTIM Contractor: ESTIM, Tanzania |
|
TANZANIA |
10. 132/11 kV First Khawaneej SS
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: L&T |
|
UAE |
11. MBR Solar SS Extension
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: ABB |
|
UAE |
12. Madinath Al Estethmar Substation_Dewa Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor:ABB |
|
UAE |
13. 132-11KV Performer Village DEWA Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: L&T |
|
UAE |
14. 132/11KV Keranola Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: GE |
|
UAE |
15. 1 NO. 132/11 KV SUBSTATION – AMWAJ
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: L&T |
|
UAE |
16. Khazna Data Center Extension Project
Project Details | System Involved | Location |
---|---|---|
Client: Mubadala Contractor: Laing O'Rourke |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppressions system |
UAE |
17. Qasr Al-Hosan Abudhabi Cultural Foundation
Project Details | System Involved | Location |
---|---|---|
Client: Abudhabi Tourism & Culture Contractor: Voltas |
|
UAE |
18. Mekaines RPS & Associated Pipeline Project Qatar
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor: HLG, Qatar |
|
QATAR |
19. Trident VII Helideck ADOC project (Foam Skid)Package- c (PRPS-5)
Project Details | System Involved | Location |
---|---|---|
Client: ADOC Contractor: ADOC |
|
UAE |
20. Pavement & Drainage System for Tanks
Project Details | System Involved | Location |
---|---|---|
Client: GASCO Contractor: Tecton, Ajman |
|
UAE |
21. Foam System for the Hydraulic Press M35 & M25
Project Details | System Involved | Location |
---|---|---|
Client: TALEX, Abudhabi |
|
UAE |
22. Sprinkler System for NHOM Sub Con Facility
Project Details | System Involved | Location |
---|---|---|
Client: NKOM Contractor: NKOM |
|
QATAR |
23. Phase-12 Qatar Substations
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor: Siemens |
|
QATAR |
24. Phase-12 Qatar Substations
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor:L&T |
|
QATAR |
25. 3 Nos of DEWA Substations (Majan, MaAden, Nad Al Hammar)
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: ABB |
|
UAE |
26. BPS LRT-Central 66/33KV Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Alstom |
|
UAE |
27. Lusail Substation
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor: L&T |
|
QATAR |
28. DEWA 6 Nos of Substations (Barsha Housing, Jumairah Hills, Manaseha, Mobility, Nakheel Road, Saadast)
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Siemens |
|
UAE |
29. Jebel Ali Power Station M-Extension Project, (BOP) Dubai, UAE
Project Details | System Involved | Location |
---|---|---|
Client: M/s DEWA Contractor:Siemens, Germany Capacity: 700 MW |
|
UAE |
30. Jebel Ali Power Station M-Extension Project (GT)Dubai, UAE
Project Details | System Involved | Location |
---|---|---|
Client: M/s DEWA Contractor: Siemens, Germany |
|
UAE |
31. UMM Al Houl Power Project, Qatar (Power & GIS Package)
Project Details | System Involved | Location |
---|---|---|
Client: UMM Al Houl Power IWPP (Power) Kahramaa (GIS) Contractor: Samsung C&T Korea Capacity: 2520 MW |
|
QATAR |
32. UMM Al Houl Power Project, Qatar (Desalination & RO Package)
Project Details | System Involved | Location |
---|---|---|
Client: UMM Al Houl Power IWPP Contractor: Hitachi, Japan |
|
QATAR |
33. 132/11 kV Business Tower and Humanitarian City Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Alstom |
|
QATAR |
34. 132/11 kV MBR Sate Substation
Project Details | System Involved | Location |
---|---|---|
Client : DEWA Contractor : Danway |
|
UAE |
35. 132/11 kV UMSQEMRD Substation
Project Details | System Involved | Location |
---|---|---|
Client : DEWA Contractor : L&T |
|
UAE |
36. Khazna Data Center, Masdar City, Abudhabi
Project Details | System Involved | Location |
---|---|---|
Client : MUBADALA Contractor : M+W/ Commodore JV |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppression System for entire Data Centre including pre-action system for White Space, Deluge system for Generator Rooms & Wet System for Office Areas. Total 31 Zone Control Valves |
UAE |
37. Khazna Data Center, Meydan, Dubai
Project Details | System Involved | Location |
---|---|---|
Client : MUBADALA Contractor : M+W/ Commodore JV |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppression System for entire Data Centre including pre-action system for White Space, Deluge system for Generator Rooms & Wet System for Office Areas. Total 31 Zone Control Valves |
UAE |
38. 132/11 kV MUDON Substation
Project Details | System Involved | Location |
---|---|---|
Client : DEWA Contractor : Jazeera Emirates Power |
|
UAE |
39. Ferrari World Abu Dhabi Phase -2
Project Details | System Involved | Location |
---|---|---|
Client : Farah Leisure Theme Park LLC Contractor : Sixco / Voltas |
|
ABU DHABI |
40. Al Udeid Air Base Qatar Helicopter Hanger Building
Project Details | System Involved | Location |
---|---|---|
Client : Qatar Armed Force Contractor : Mapco INC WLL, Qatar |
|
QATAR |
41. Electrical Building Project, RAS Laffan Qatar
Project Details | System Involved | Location |
---|---|---|
Client : Kahramaa Contractor : Medgulf Construction Co W.L.L |
|
QATAR |
42. Qatar Power Transmission System Expansion Phase-II Stage-1 Substations
Project Details | System Involved | Location |
---|---|---|
Client : Kahramaa Contractor : L&T |
|
QATAR |
43. Yanbu Power and Desalination Plant (Boiler Package)
Project Details | System Involved | Location |
---|---|---|
Client: SWCC Contractor: Alstom, USA |
|
SAUDI ARABIA |
44. Remote-Manual Operation Facility For Foam System in “G” Station Fuel Oil Storage
Project Details | System Involved | Location |
---|---|---|
Client: DEWA |
|
UAE |
45. 132/11 kV Khil Road Substation For Sobha Hartland
Project Details | System Involved | Location |
---|---|---|
Client : DEWA Contractor : Danway |
|
UAE |
46. 400 kV MBR Solar Substation
Project Details | System Involved | Location |
---|---|---|
Client : DEWA Contractor : ABB |
|
UAE |
47. 132/11 kV Substations (Khenizi & Bahri) at Palam Jumeirah, Dubai
Project Details | System Involved | Location |
---|---|---|
Client : DEWA Contractor : ETA |
|
UAE |
48. 33/11 kV Primary Substation at Al Ain Hospital & Associated 33 kV Cable Works.
Project Details | System Involved | Location |
---|---|---|
Client : MUSANADA (Abudhabi General Service Company) Contractor : L&T |
|
UAE |
49. Project: Installation of 20” Wet Gas Pipe Line between KM & KS
Project Details | System Involved | Location |
---|---|---|
Client : Qatar Petroleum Contractor : Panorama WLL, Qatar |
Deluge Skid |
QATAR |
50. CO2 Fire Suppression System for LG-5
Project Details | System Involved | Location |
---|---|---|
Client : ADGAS | CO2 System |
UAE |
51. 132/33 kV HALUL Substation
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Petroleum Contractor : L&T |
|
QATAR |
52. 66/11 kV Maamoura South Substation
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor: Siemens |
|
QATAR |
53. 132/11 kV MIRA Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Danway |
|
UAE |
54. 132/11 kV Shibahts Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Danway |
|
UAE |
55. 132/11 kV Wellness Village Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Alstom |
|
UAE |
56. 132/11 kV Canal Bridge Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Alstom |
|
UAE |
57. Aweelah Aluminum Extrusion Plant Project (TALEX)
Project Details | System Involved | Location |
---|---|---|
Client:ADCD Contractor: Butec |
|
UAE |
58. Airside Tunnel project in Midfield Terminal Construction, Abu Dhabi
Project Details | System Involved | Location |
---|---|---|
Client: Abudhabi Airport Authority Contractor: L&T |
|
UAE |
59. Yanbu Power and Desalination Plant Package “D”-KSA
Project Details | System Involved | Location |
---|---|---|
Client: SWCC Contractor: Doosan Heavy Industries & Construction co. Ltd. Korea Capacity: 550,000 m3/d-Water Production |
|
SAUDI ARABIA |
60. Yanbu-III Power & Desalination Package-P and Package-T Project – KSA
Project Details | System Involved | Location |
---|---|---|
Client: SWCC Contractor: Samsung Engineering Co. Ltd, Korea Capacity: 2708.5 MW |
|
SAUDI ARABIA |
61. 132/11 kV Wadi Safa Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Danway |
|
UAE |
62. 132/11 kV Theme Park Substation
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: ETA |
|
UAE |
63. La Ville Contemporaine Business Bay Ph-1
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Properties Contractor: Al Naboodah LLC |
|
UAE |
64. 33/11 Kv Al Khurair, Al Khaleef, Al Foah, Al Majloof, Al Mohayer – 5 Substations
Project Details | System Involved | Location |
---|---|---|
Client: AADC Contractor: L&T |
|
UAE |
65. Dukhan 33 kV Substation Project-6 Substatinons ( DTS-1 33KV SS, Zikreet 33KV SS, Ummbab 33KV SS, Arab 33KV SS, DTS-2 33KV SS, PSS 33KV SS)
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Petroleum Contractor: L&T, Qatar |
|
QATAR |
66. 132/22 kV new Port 1, 2 &3 Substations
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor: L&T, Qatar |
|
QATAR |
67. 66/11 kV Semi Underground Substation Maamoura South Substation
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor: Siemens, Qatar |
|
QATAR |
68. 66/11 kV South District Substation
Project Details | System Involved | Location |
---|---|---|
Client: Kahramaa Contractor: Siemens, Qatar |
|
QATAR |
69. E18 & E19 Substations at Northern and Eastern Area of Emirates
Project Details | System Involved | Location |
---|---|---|
Client: FEWA Contractor: ETA, Dubai. |
|
UAE |
70. 400/220/33kV Grid Station at Mirfa
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: Siemens, Abudhabi |
|
UAE |
71. 33/11 Kv Substation at Al Nahda
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: Siemens, Abudhabi |
|
UAE |
72. RAMS-2, Shamal, Ghulah, Sieh Al Burairat and Hamraniya Substation
Project Details | System Involved | Location |
---|---|---|
Client: FEWA Contractor: NCC, Dubai |
|
UAE |
73. Goldman Sachs New Office at DIFC (Dubai International Financial Centre)
Project Details | System Involved | Location |
---|---|---|
Client: Goldman Sachs Contractor: BK Gulf |
|
UAE |
74. Masfout, Tebeya, Ajman Main, Haraniya, Manama, Siji, Dhahid Main Sub stations
Project Details | System Involved | Location |
---|---|---|
Client: FEWA Contractor: NCC, Dubai |
|
UAE |
75. New 33/11KV Substation @ SHAIKH KHALIFA Shaikh Khalifa Hospital, Riffah, Zaith and Jazeerah
Project Details | System Involved | Location |
---|---|---|
Client: FEWA Contractor: NCC, Dubai |
|
UAE |
76. 133/11 KV Substation at South Shamkha
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: ETA, Abudhabi |
|
UAE |
77. 132/11 KV Substation at Golf Course
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: ETA, Dubai |
|
UAE |
78. 220/33 kV Substation at Al Ain
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: M/s ETA |
|
UAE |
79. FEWA 132/33 Kv Substation Port Fujairah
Project Details | System Involved | Location |
---|---|---|
Client: FEWA Contractor: M/s ETA |
|
UAE |
80. 550 MW Jordan IPP 3 Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: National Electric Power Co. Contractor: M/s Lotte, Korea |
|
JORDAN |
81. FEWA 132/33 Kv Substation at Dihan Northern Emirates
Project Details | System Involved | Location |
---|---|---|
Client: FEWA Contractor: M/s L&T |
|
UAE |
82. DEWA D Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity and Water Authority |
|
UAE |
83. DEWA E Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity and Water Authority |
|
UAE |
84. Zaher 220/33 KV Grid Station
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: M/s L&T |
|
UAE |
85. 66/11KV Doha Industrial Substation
Project Details | System Involved | Location |
---|---|---|
Client: Kaharama Contractor: M/s Siemens |
|
QATAR |
86. 33/11 KV Substation at Rabha
Project Details | System Involved | Location |
---|---|---|
Client: ADDC Contractor: M/s Inabensa |
|
ABU DHABI |
87. Automatic Dry Power System Projecting of 7 nos of LPG/LNG tanks of 54 mts / 45 mts dia
Project Details | System Involved | Location |
---|---|---|
Client: ADGAS – Das Island Plant # 27 |
|
ABU DHABI |
88. 400/200/33 KV Grid Sub Station at BAB (BAB-2)
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: M/s Alstom, Abudhabi |
|
UAE |
89. 132/11 KV Substation at Mussafah, Abudhabi
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: M/s ETA |
|
UAE |
90. New 400/132/33 KV Grid Sub Station at SHAMKHA, Abudhabi
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: M/s Siemens |
|
UAE |
91. Jumeirah Lake Tower Infrastructure & Landscaping
Project Details | System Involved | Location |
---|---|---|
Client: NAKHEEL Contractor: M/s Wade Adams Contracting |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppression System for Diesel Generator Room at Jumeirah Lake Towers |
UAE |
92. Deira City Centre Food Court
Project Details | System Involved | Location |
---|---|---|
Client: MAF Investment LLC Contractor: Zener Electrical Contracting |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppression System for 12 Food Outlets at DEIRA City Centre Shopping Mall |
UAE |
93. CITI Bank Project Al Ain Office Branch
Project Details | System Involved | Location |
---|---|---|
Client: CITI Bank Contractor: Zener Electronics |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppression System for Main Server Room in Basement Floor |
UAE |
94. 220 KV ASAB Switching Sub Station
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: M/s Alstom, Abudhabi |
|
UAE |
95. 220/33 KV Grid Station at Qusahwira, Abudhabi
Project Details | System Involved | Location |
---|---|---|
Client: ADCO Contractor: M/s Siemens |
|
UAE |
96. Bazian Refinery Expansion 2 Project
Project Details | System Involved | Location |
---|---|---|
Client: Bazian Pet Co Contractor: Tebodin Middle east |
|
IRAQ |
97. HFO Diesel Power Plants, Iraq ( 200 MW North Diwaniyah Diesel Power Plant, 200 MW Missan Diesel Power Plant, 200 MW Karbala Diesel Power plant, 200 MW East Diwaniyah Diesel Power plant )
Project Details | System Involved | Location |
---|---|---|
Client: Ministry of Electricity, Iraq Kahramaa (GIS) Contractor: STX Heavy Industries |
|
IRAQ |
98. Barka 3 Independent Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Al Suwaidi Power Co. Oman Contractor: Siemens |
|
OMAN |
99. STU & AGRO Packages Qatar Petroleum
Project Details | System Involved | Location |
---|---|---|
Client: Petrofac |
|
QATAR |
100. Bazian Refinery Phase-2
Project Details | System Involved | Location |
---|---|---|
Client: Qaiwan Consultant: Tebodin |
|
IRAQ |
101. Ras Al Khair Power Plant Phase I
Project Details | System Involved | Location |
---|---|---|
Client: SWCC Contractor: SEPCO III Capacity: 12x200 – 2,400 MW Net Power output (1.050 MW Supply to SEC + 1,350 MW Supply to Ma’aden Aluminum Complex) 1,025 Tm³/d water production (1,000 Tm³/d supply to SWCC + 25 Tm³/d supply to Ma’aden Aluminum Complex) |
|
SAUDI ARABIA |
102. Al Habtoor KPIZ 33/11 kv primary substation project
Project Details | System Involved | Location |
---|---|---|
Client: ADDC/ADPC/HLG Contractor: SIEMENS |
|
ABU DHABI |
103. Dry Chemical System (CLP) for KJO AL-Khafji crude related offshore projects (KCROP)
Project Details | System Involved | Location |
---|---|---|
Client: Al Khafji Crude Related Offshore Operations Consultant: TECHNIP |
|
SAUDI ARABIA |
104. Fire Fighting System (CLP) for KJO AL-Khafji crude related offshore projects (KCROP)
Project Details | System Involved | Location |
---|---|---|
Client: Al Khafji Crude Related Offshore Operations Contractor: TECHNIP |
|
SAUDI ARABIA |
105. FM 200 Fire Suppression System(CLP) for KJO AL-khafji crude related offshore projects (KCROP)
Project Details | System Involved | Location |
---|---|---|
Client: Al Khafji Crude Related Offshore Operations Contractor: TECHNIP |
|
SAUDI ARABIA |
106. 132 kv Substation Reinforcement works at taweelah-A132kv Substation (1 Substations)
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: L&T, Abu Dhabi |
|
ABU DHABI |
107. Khuraithiyath Substation
Project Details | System Involved | Location |
---|---|---|
Client: KAHRAMA Contractor: ABB, Qatar |
|
QATAR |
108. Khalifa Port & Industrial Zone (5Substations)
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: L&T, Abu Dhabi |
|
ABU DHABI |
109. 3 x 60 MW Co-Generation Power Plant, located at SEZ – Unit, APIIC Industrial Park, G. Koduru, Makavarapalem Mandal, Visakhapatinam District – 531 113, Andhra Pradesh
Project Details | System Involved | Location |
---|---|---|
Client: M/s. Anrak Aluminium Limited, Hyderabad, India Consultant: M/s. MN Dastur & Co., Pvt Ltd, Chennai |
|
INDIA |
110. 2 x 150 MW Coal Based Thermal Power Plant, Ph-2, Chillakur Mandal, Nellore District, Andhra Pradesh
Project Details | System Involved | Location |
---|---|---|
Client: M/s. Madhucon Projects Limited, Hyderabad, India Consultant: M/s. MN Dastur & Co., Pvt Ltd, Chennai |
|
INDIA |
111. Baby Memorial Hospital
Project Details | System Involved | Location |
---|---|---|
Client: Baby Memorial Hospital, Calicut Contractor: In house |
|
INDIA |
112. Al Tawyeen 220/33KV GIS Substation, UAE
Project Details | System Involved | Location |
---|---|---|
Client: Transco Contractor: Areva T&D |
|
ABU DHABI |
113. 33/11KV FJCC Substation Project
Project Details | System Involved | Location |
---|---|---|
Client: FEWA Contractor: ETA PPD |
|
FUJAIRAH |
114. 220/132/33/11KV Substations. The GUP expansion Phase III Project
Project Details | System Involved | Location |
---|---|---|
Client: TAKREER – Abu Dhabi Contractor: Areva |
|
ABU DHABI |
115. 132/33 KV Sub station at Khor Fakkan
Project Details | System Involved | Location |
---|---|---|
Client: TRANSCO Contractor: ETA |
|
UAE |
116. 132/11 KV Substation (LBAC & KHAWANIJ NORTH)
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Areva |
|
DUBAI |
117. Mesaieed Container Terminal Berth7
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Petroleum Contractor: STFA |
|
QATAR |
118. Chabahar Gas Turbine Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Iran Power Development Company Contractor: Mapna International |
|
IRAQ |
119. Hillside Condominium 7 Buildings
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Festival City Contractor: Khansaheb Consultant: Halcrow Yolles |
|
DUBAI |
120. Up gradation of Fire Protection System of 132/33 KV substation building at “E” station, Jebel Ali
Project Details | System Involved | Location |
---|---|---|
Client: DEWA |
|
DUBAI |
121. CE/0521/2009 – Design, Supply, Fabrication, Installation, Testing & Commissioning of Spray Cooling System with accessories for Fuel storage tanks at “G” station
Project Details | System Involved | Location |
---|---|---|
Client: DEWA |
|
DUBAI |
122. Fire Cabinets for Yas Island
Project Details | System Involved | Location |
---|---|---|
Client: Zener Electrical & Electronics |
|
ABU DHABI |
123. DEWA – LBAC & KWJN Substations Contract No. CE/0716/2008
Project Details | System Involved | Location |
---|---|---|
Client: DEWA Contractor: Areva |
|
DUBAI |
124. Upgrading of Al Salam Street and Abu Dhabi City Ring Road Contract No. 1 – Road Tunnel – Water Mist system
Project Details | System Involved | Location |
---|---|---|
Client: Abudhabi Municipality Contractor: Samsung Saif Bin Dharwish |
|
ABU DHABI |
125. DEWA - Order CE/0660/2008/ Augmentation of Foam Injection & Water Spray Cooling Systems with accessories including Design, Supply, Installation, Testing & Commissioning of Fuel Oil Storage & Day Tanks at “D’ station, Phase I, Jebel Ali
Project Details | System Involved | Location |
---|---|---|
Client: DEWA |
|
DUBAI |
126. Jebel Ali “M” Station
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority (DEWA) Contractor: Doosan Consultant: Fichtner Engineering Consultants Capacity: 1330 MW |
|
DUBAI |
127. Jebel Ali “M” Station
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority (DEWA) Contractor: Fisia Italimpianti Consultant: Fichtner Engineering Consultants |
|
DUBAI |
128. Ras Abu Fontas RAF – A1
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Electricity & Water Authority (QEWA) Contractor: Fisia Italimpianti Consultant: Parsons Brinckerhoff International Inc. |
|
QATAR |
129. Service Tunnel Oud Metha & Doha Street at Business Bay
Project Details | System Involved | Location |
---|---|---|
Client: Al Naboodah Engg Services |
|
DUBAI |
130. Aweer Gas Turbine Power Station “H” Phase-III
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority (DEWA) Contractor: Emirates Trading Agency (PPD) Consultant: Mott MacDonald Capacity: 800 MW |
|
DUBAI |
131. Fujairah IWPP
Project Details | System Involved | Location |
---|---|---|
Client: Federal Electricity & Water Authority (FEWA) Contractor: Bemco Intl Capacity: 225 MW |
|
FUJAIRAH |
132. Shuaibah IWP
Project Details | System Involved | Location |
---|---|---|
Client: SMAWEC Contractor: Doosan Heavy Industries & Construction Co. |
|
SAUDI ARABIA |
133. Water Mist System for Service Tunnel ST1 & ST2
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Properties Contractor: Zener Electrical Contracting Co. Consultant: Halcrow |
|
DUBAI |
134. Ras Abu Fontas B2 Expansion Project
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Electricity and Water Authority Contractor: GE International Inc, USA Consultant: Mott MacDonald Capacity: 750 MW |
|
QATAR |
135. Palm Jumeirah Trunk Corwn T3 & T4 District Cooling Plant
Project Details | System Involved | Location |
---|---|---|
Client: Nakheel Contractor: Shinryo Corporation Consultant:Halcrow |
|
DUBAI |
136. Ras Abu Fontas B2 – Fire Alarm
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Electricity and Water Authority Contractor: ABB AG, Germany Consultant: Mott MacDonald Capacity: 750 MW |
|
QATAR |
137. Neka Combined Cycle Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Mapna Contractor: Nakhlestani General Trading LLC |
|
IRAN |
138. Discovery Garden Infrastructure and Landscaping
Project Details | System Involved | Location |
---|---|---|
Client: Nakeel Contractor: Al Naboodah |
|
DUBAI |
139. RasAbu Fontas B2-Power and Desalination Station
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Electricity and Water Corporation (QEWC) Contractor: Fisia Itamlimpianti, Italy Consultant: Mott MacDonald Capacity: 750 MW |
|
QATAR |
140. Movenpick Hotel & SPA and Oceana Residences at Palm Jumeirah
Project Details | System Involved | Location |
---|---|---|
Client: Nakheel Contractor: Bahwan Technical Contracting Consultant: Daral-handasah Shair and Partners |
|
DUBAI |
141. District Cooling Project at Khalif City, Abu Dhabi
Project Details | System Involved | Location |
---|---|---|
Client: Nael Energy & General Enterprises Est. Consultant: Archon |
|
AL AIN |
142. Discovery Gardens (District Cooling Plant 1 & 2)
Project Details | System Involved | Location |
---|---|---|
Client: Nakheel Contractor: Shinryo Corporation Consultant: Halcrow |
|
DUBAI |
143. El Kureimat Power Station
Project Details | System Involved | Location |
---|---|---|
Client:Power Generation Engg & Services Co. Contractor: Siemens AG Power Generation, Germany |
|
EGYPT |
144. Jebel Ali Power & Desalination “L Phase II
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity &Water Authority Contractor: Hyundai Engg & Construction Co. Consultant: Lahmeyer International |
|
DUBAI |
145. Jebel L2 Gas Turbine Protection 4x200MW
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Siemens AG, Germany Consultant: Lahmeyer International Capacity: 1200 MW |
|
DUBAI |
146. Shirvan Gas Turbine Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Mapna Co. |
|
IRAN |
147. Aweer Gas Turbine Power Plant Station “H” Phase II, U.A.E.
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Arabian Bemco Consultant: Mott MacDonald Capacity: 400 MW |
|
DUBAI |
148. Al Aweer Gas Turbine Power Station 3x250MW "H” Phase II, U.A.E.
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Siemens AG Power Generation, Germany Consultant: Mott MacDonald Capacity: 400 MW |
|
DUBAI |
149. Jumeirah Lake Towers Parking Garages
Project Details | System Involved | Location |
---|---|---|
Client: DMCC Contractor: Trinity Engg. Services Consultant: Wilber Smith Project Management: Faithful & Gold |
|
DUBAI |
150. El Atf & Sidi Krir Project
Project Details | System Involved | Location |
---|---|---|
Client: Middle Delta Electricity Production Contractor: Toshiba Plant & Services Corporation - Japan Consultant: Power Generation Engineering Co. |
|
EGYPT |
151. New Talkha Power Station 750MW CCP
Project Details | System Involved | Location |
---|---|---|
Client: Power Generation Engg & Services Co. Contractor: Siemens AG Power Generation, Germany Capacity: 750 MW |
|
EGYPT |
152. Cine Star Cinema Fit-out at Mall of Emirates
Project Details | System Involved | Location |
---|---|---|
Client: Majid Al Futtaim Contractor: Zener Steward |
|
DUBAI |
153. Jebel Ali Power & Desalination "L" Station for Administration Building
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Al Ghandhi CCC & Elservco Consultant: Lahmeyer International |
|
DUBAI |
154. Dubai Land Sub Station
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Siemens, Dubai |
|
DUBAI |
155. Mesaieed Container Terminal Berth 7
Project Details | System Involved | Location |
---|---|---|
Client: Qatar Petroleum Contractor: M/s. ABB – Germany |
|
QATAR |
156. Saba Commercial Tower
Project Details | System Involved | Location |
---|---|---|
Client: Saba Real Estate Contractor: Reliance Electro Mechanical Co (REMCO). Consultant: GEMAC |
|
DUBAI |
157. Shuaibah North Co-Generation
Project Details | System Involved | Location |
---|---|---|
Client: Ministry of Electricity & Water - Kuwait Contractor: Fisia Italimpianti |
|
KUWAIT |
158. Al Dhahra Kohinoor Rice Mill Project, Abudhabi
Project Details | System Involved | Location |
---|---|---|
Client: Al Dahra National Investments Contractor: AMANA |
Design, Calculation, Supply, Installation, Testing & Commissioning of mau Water Mist Fire Suppression System for 2 nos of QRM rooms |
UAE |
159. Al Jadaf Development Roads and Infrastructure Phase-1, Service Tunnels 1& 2
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Properties Contractor: Belhasa Six Construction LLC |
Design, Calculation, Supply, Installation, Testing & Commissioning of Water Mist Fire Suppression System for SERVICE TUNNELS – 1 & 2 @ JADAF |
UAE |
160. Dhaid 400/220 KV Sub Station
Project Details | System Involved | Location |
---|---|---|
Client: Federal Electricity & Water Authority Contractor: AREVA T&D |
|
UAE |
161. Burj Dubai 132/11KV S/S and Associated Works
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Siemens, Dubai |
|
DUBAI |
162. 3MGD Reverse OSMOSIS Plant At Ghalilah, Ras Al Khaimah - UAE
Project Details | System Involved | Location |
---|---|---|
Client: Federal Electricity Water Authority Contractor: Fisia Italimpianti, Italy |
|
UAE |
163. Jebel Ali Power & Desal Station “L” Ph-I
Project Details | System Involved | Location |
---|---|---|
Client : Dubai Electricity & Water Authority Contractor: Toshiba Corporation Consultant: Siemens, Dubai Capacity: 700 MW |
|
DUBAI |
164. Jumeirah Beach Residence (P-055)- 132/11KV S/S Package No 0521
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Emirates Trading Agency |
|
DUBAI |
165. Emirates Golf Club House, Villas & Maisonettes
Project Details | System Involved | Location |
---|---|---|
Client: Emaar Properties (PJSC) Contractor: Zener Steward |
|
DUBAI |
166. Neka Combined Cycle Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Mapna International, Iran Contractor: Ameran Ofogh |
|
IRAN |
167. Contract No. CE/011A/2004 for Ruwaiyah, Updown and Meadows 132/11 KV S/S
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Siemens, Dubai |
|
DUBAI |
168. Umm Al Nar Independent Power & Water Project
Project Details | System Involved | Location |
---|---|---|
Client: Arabian Power Company Contractor: Toshiba Corporation Consultant: Mott MacDonald Capacity: 1500 MW |
|
ABU DHABI |
169. Emalab - Linear Benzene Alkyl Co.
Project Details | System Involved | Location |
---|---|---|
Client: EMALAB Consultant: Tebodin M.E. |
|
DUBAI |
170. Royal Flight Hangar at Seeb Al Maymoon
Project Details | System Involved | Location |
---|---|---|
Contractor: Bahwan Engineering Co. LLC. |
|
OMAN |
171. B+G+5 Dubai Police Head Quarters
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Police Contractor: Drake & Scull Consultant: ARENCO |
|
DUBAI |
172. Proposed New Store Building for Etisalat at Sajja - Sharjah
Project Details | System Involved | Location |
---|---|---|
Client: ETISALAT Contractor: Ranya General Construction Co. Consultant: Bin Dalmouk |
|
SHARJAH |
173. Nadd Al Hamar – Beirut Road Tunnel
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Municipality Contractor: BK Gulf LLC Consultant: Parsons |
|
DUBAI |
174. Al Reef Shopping Mall
Project Details | System Involved | Location |
---|---|---|
Client: Al Ghurair Group LLC Contractor: Geco Mech & Elect Ltd. Consultant: RMJM |
|
DUBAI |
175. AGT Pipelines and Facilities
Project Details | System Involved | Location |
---|---|---|
Client: Spie Capag – Petrofac Intl. Ltd. | • Fire Alarm System |
GEORGIA& AZERBAIJAN |
176. Damavand Combined Cycle Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: HICO FZE Contractor: Hirbodan |
|
IRAN |
177. Five Combined Cycle Powr Plants (5CCPP)
Project Details | System Involved | Location |
---|---|---|
Client: Mapna International FZE |
|
IRAN |
178. New ROP Facilities at Seeb Airport
Project Details | System Involved | Location |
---|---|---|
Client: Royal Oman Police Contractor: Halcrow Consultant: Galfar Engg & Contg LLC |
|
OMAN |
179. Tabriz, Sarab & Ardabil Pipeline Facilities
Project Details | System Involved | Location |
---|---|---|
Client: National Iranian Oil Engineering & Constrn. Group Consultant: In House |
|
IRAN |
180. Mussafah SVC
Project Details | System Involved | Location |
---|---|---|
Client: Abu Dhabi Water & Electricity Authority Contractor: Lahmeyer Intl. Consultant: Toshiba Corporation |
|
ABU DHABI |
181. Al Ain South West SVC
Project Details | System Involved | Location |
---|---|---|
Client: Abu Dhabi Water & Electricity Authority Contractor: Lahmeyer Intl. Consultant: Toshiba Corporation |
|
AL AIN |
182. Shariati Combined Cycle Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Mapna International FZE Consultant: In House |
|
IRAN |
183. Ras Laffan Combined Cycle Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Enel Power, Italy Consultant: In House Capacity: 1000 MW |
|
QATAR |
184. Ras Laffan Combined Cycle Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Enel Power, Italy Consultant: In House Capacity: 1000 MW |
|
QATAR |
185. Kazeroon GT Power Plant, Iran
Project Details | System Involved | Location |
---|---|---|
Client: Mapna – Iran Consultant: In House |
|
IRAN |
186. South Pars Gas Field Development – Phase 1
Project Details | System Involved | Location |
---|---|---|
Client: Pars Oil & Gas Company - Iran Consultant: Inhouse |
|
IRAN |
187. Saniya & Al Wagon – Al Ain 230/33KV Substation
Project Details | System Involved | Location |
---|---|---|
Client: Abu Dhabi Water & Electricity Authority Contractor: Ansaldo T&D Consultant: Matt MacDonald |
|
AL AIN |
188. 220/33 KV Substation – City Center, Al Ain
Project Details | System Involved | Location |
---|---|---|
Client: Abu Dhabi Water & Electricity Authority Contractor: Target Engineering. Consultant: Mott Mac Donald |
|
AL AIN |
189. Jebel Ali “K” Station
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Enel Power Capacity: Fichtner (Germany) |
|
DUBAI |
190. Kalba Power Station – Unit 4
Project Details | System Involved | Location |
---|---|---|
Client: Sharjah Electricity & Water Authority Contractor: GE Energy, Europe Consultant: In House |
|
N.EMIRATES UAE |
191. Enhancement of Aweer 132/33 KV SS
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Emirates Trading Agency Consultant: In House |
|
DUBAI |
192. 220/33/11 KV Substation – Samha, Al Ain
Project Details | System Involved | Location |
---|---|---|
Client: Abu Dhabi Water & Electricity Authority Contractor: Sumitomo Corporation Consultant: Lahmeyer International |
|
AL AIN |
193. Mirfa Desalination Plant, Abu Dhabi
Project Details | System Involved | Location |
---|---|---|
Client: Abu Dhabi Water & Electricity Authority Contractor: Fisia Italimpianti, Italy Consultant: In House |
|
ABU DHABI |
194. Khoy Combined Cycle Power Plant
Project Details | System Involved | Location |
---|---|---|
Client: Iran Power Development Company Consultant: Monenco, Iran |
|
IRAN |
195. Dadnah Substation
Project Details | System Involved | Location |
---|---|---|
Client: Federal Electricity & Water Authority Contractor: Emirates Trading Agency Consultant: In House |
|
N.EMIRATES UAE |
196. Mankhool Substation - Dubai
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Consultant: In House |
|
DUBAI |
197. Fars Combined Cycle Power Plant –Iran
Project Details | System Involved | Location |
---|---|---|
Client: Mapna, Iran Consultant: Monenco Engineering Consultants |
|
IRAN |
198. Repowering of Jebel Ali Power & Desalination “D” Phase II
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Hyundai Engg. Constrn Co. Ltd. Consultant: Fichtner Consulting Engineers Capacity: 400 MW |
|
DUBAI |
199. 132/11 Kv substations at Thanya & Emaar
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Siemens Pakistan Consultant: In House |
|
DUBAI |
200. Telecom Building At Al Nahda, Dubai
Project Details | System Involved | Location |
---|---|---|
Client: Etisalat Contractor: Al Futtaim Tarmac Consultant: Nutek Engg Consultants |
|
DUBAI |
201. FEWA Contract No. E2/98, Gas Turbines for Northern Emirates at Nakheel & Qidfa
Project Details | System Involved | Location |
---|---|---|
Client: Federal Electricity & Water Authority Contractor: ETA - PPD Consultant: In House |
|
N.EMIRATES UAE |
202. Midelec Gas Turbine Power Plant 3x100MW at Alexandria, Egypt
Project Details | System Involved | Location |
---|---|---|
Client: Siemens , Germany Consultant: KWI architects – Austria Capacity: 300 MW |
|
EGYPT |
203. Combined Cycle Power Plant Shahid Rajai, Iran
Project Details | System Involved | Location |
---|---|---|
Client: Mapna, Iran Consultants: Monenco Engineering Consultants |
|
IRAN |
204. Fire Detection for Shazand 4 x 325 TPP
Project Details | System Involved | Location |
---|---|---|
Client: Mapna, Iran Consultant: In House |
|
IRAN |
205. Telecom Building at Al Majaz, Sharjah
Project Details | System Involved | Location |
---|---|---|
Client: Etisalat Contractor: Al Hamad Contracting Company Consultant: Bin Dalmouk |
|
SHARJAH |
206. E06/97(1) 132/33 Kv substations at Hamda & Munay 33/11 Kv substation @ Muzeira
Project Details | System Involved | Location |
---|---|---|
Client: Federal electricity & water authority Contractor: ETA – PPD Consultant: Kennedy & Donkin middle east |
|
N.EMIRATES UAE |
207. Pumping station, Lulu island at Abu Dhabi
Project Details | System Involved | Location |
---|---|---|
Client: Abu Dhabi Water & Electricity authority |
|
ABU DHABI |
208. Telecom Building at Al Majaz, Sharjah
Project Details | System Involved | Location |
---|---|---|
Client: Etisalat Contractor: Al Hamad Contracting Company Consultant: Bin Dalmouk |
|
SHARJAH |
209. 5 Star Hotel at Reqa West
Project Details | System Involved | Location |
---|---|---|
Client: Nasser Rashid Lootah Contractor: Emirates Trading Agency – M&E Consultant: National Engineering Bureau |
|
DUBAI |
210. Telecom Building at Al Raffa, Dubai
Project Details | System Involved | Location |
---|---|---|
Client: Etisalat Contractor: Engineering Contracting Company Consultant: NUTEK |
|
DUBAI |
211. DEWA Contrct no CE/106/98 Mushrif-2, 132/11KV Substations
Project Details | System Involved | Location |
---|---|---|
Client: Dubai Electricity & Water Authority Contractor: Parsian, Iran Consultant: In House |
|
DUBAI |
212. Montazer Ghaem Combined Cycle Power Plant, Iran
Project Details | System Involved | Location |
---|---|---|
Client: Mapna, Iran Consultant: MONENCO Engineering |
|
IRAN |
213. Warehouse, for Sharp ME at Jebel Ali
Project Details | System Involved | Location |
---|---|---|
Client: Sharp Middle East Contractor: Penguin Engineering Consultant: RMJM |
|
DUBAI |
214. Debenhams Shopping Complex – 3 floors at Deira City Centre
Project Details | System Involved | Location |
---|---|---|
Client: Debenhams Contractor: Zener Steward Consultant: R / Evolution |
|
DUBAI |
215. Desalination Plants at 1). Ajman 2). Ras Al Khaimah 3). Fujairah
Project Details | System Involved | Location |
---|---|---|
Client: Ministry of Electricity & water authority Contractor: Emirates Trading Agency Consultant: Tebodin Engineering consultants |
|
N.EMIRATES UAE |
216. Fertilizer Plant at Jebel Ali Free Zone
Project Details | System Involved | Location |
---|---|---|
Client: SPIC Consultant: In-house |
|
DUBAI |